All new windows, new flooring, new baseboards new lighting, new receptacles and switches, updated electric panel, new instant water heater, New stove and refrigerator, updated plumbing. The roof is metal and no leaks, The AC runs very well, Everything needed is on site to finish the garage conversion master with 3/4 bath that is 75% complete. Health makes seller unable to finish from afar. Our loss is your gain. Licensed bonded Handy man has done most of the most recent work in this renovation that started in 2021.
Enough flooring and baseboards are on site to finish, bathroom tiles are on site to finish what was started there in conversion. Glidden Summer Shower paint and Dove Tail Oak flooring from Lowes were used and enough on site to finish.
You will need to purchase 2 interior doors and install 4, Purchase 3 slider door slabs and install in slider mechanism already there, purchase a dishwasher and install it and finish the conversion with materials on site already.
Property Features
Cooling Information
Central Air
Electric
Heating Information
Central
Electric
Parking
Additional Parking
Off Street
Water Features
Public
Utilities
Cable Available
School Information
School Information for 10468 108TH N Street, Largo, FL 33778